• Project Information
  • Client: Ambatovy Plant Site Tamatave Madagascar
  • Date: 2020
  • Volume Dredged: 55 000m³
  • Material Dredged: thickener overflow with nickel/cobalt/chrome
  • Dredger Used: LWT Mudcat Dredger 225 HP
  • Dredger Slurry Pump Flow: 400m³ per hour
  • Dredging Hours 700

Project overview

Work is continuing for Ambatovy on their CCD Pond with water ph level 2.5(highly corrosive). First stage removal at 25 300m³ of 37 500  with the extension of additional 25 000m³ expected soon.

 